Yeterday we recorded the first sequence of our thriller, and I am impressed , because of the infrastructure that we built, an infrastructure made humil but acceptable.
The recording was made in the library of our IES. There was a planning to record the scenes, first there were some problems with the sound until the micros arrived from Raiers school. The sounds was controled from a portatil computer and the more of one records were saved there. A monitor connected with the camera visualized the images of the scene, the director was observing all time of recording the monitor while the camera was recording for controlling all things. The lights was with a light of garden focus with a complements built by industrial tecnology.There were the actors and a secundary. And for finishing the recording of the sequence there was the clapperboard, and when the boss in sequence give the order for begining, the clapperboard sound and all in silence
Suscribirse a:
Enviar comentarios (Atom)
1 comentario:
Hi Joan, thanks for your post. You are using a lot of technical words that refer to the filming of our thriller, so you should have a look at the dictioanry first, to check that they are correct.
Publicar un comentario